NK Energy update. Pastor Drew working on the inductors, which has allowed us to begin testing for things like continuity and the poles. Also, now that the machining issue is resolved, we’re able to work with the rotors. A lot of the stumbling blocks are being removed which is helping things greatly.
Mindy Martinez
댓글 삭제
이 댓글을 삭제하시겠습니까?
Rachel Dippong
댓글 삭제
이 댓글을 삭제하시겠습니까?